Muon ionization cooling is the only practical method for preparing high-brilliance beams needed for a neutrino factory or muon collider. The muon ionization cooling experiment (MICE) under development at the Rutherford Appleton Laboratory comprises a dedicated beamline to generate a range of input emittance and momentum, with time-of-flight and Cherenkov detectors to ensure a pure muon beam. A first measurement of emittance is performed in the upstream magnetic spectrometer with a scintillating-fiber tracker. A cooling cell will then follow, alternating energy loss in liquid hydrogen with RF acceleration. A second spectrometer identical to the first and a particle identification system will measure the outgoing emittance. Plans for measurements of emittance and cooling are described.

I Introduction

Over 25 years have passed since the proposal of ionization cooling cooling (). This key enabling technology for intense stored muon beams will be demonstrated experimentally for the first time in the Muon Ionization Cooling Experiment (MICE). Potential applications include: (1) neutrino factories, a powerful tool for the study of neutrino oscillation and leptonic CP violation Lindner (); and (2) muon colliders, capable of high-luminosity, multi-TeV, lepton-antilepton collisions as well as precision studies of -channel-produced Higgs bosons MC ().

MICE is an experimental program to establish the feasibility and performance of ionization cooling. The approach is to measure precisely the emittance of a 140 to 240 MeV/ muon beam both before and after an ionization-cooling cell. The MICE collaboration includes over 100 accelerator and particle physicists and engineers from Belgium, Bulgaria, China, Italy, Japan, the Netherlands, Switzerland, the UK, and the US. The experiment is currently under construction at the Rutherford Appleton Laboratory (RAL) in the UK.

Ii Mice Overview and Technical Challenges

A muon beam produced by 800 MeV protons from RAL’s ISIS synchrotron is momentum-selected and transported to the MICE apparatus (see Fig. 1). Particle identification ensures better than 99.9% muon purity. The input beam is tunable (via magnet settings and a Pb diffuser of adjustable thickness) from 1 to 12 mmrad transverse emittance. The input 6D emittance is measured Hart () in a magnetic spectrometer comprising a five-station scintillating-fiber tracker mounted within a 4 T superconducting (SC) solenoid. The tracker determines , and particle energy, and time-of-flight (TOF) counters measure the sixth phase-space coordinate, . The cooling cell consists of low- absorbers and normal-conducting (NC) RF cavities, with SC coils providing strong focusing. The final emittance is measured in a second spectrometer system identical to the first one. Muon-decay electrons would bias the emittance measurement and are eliminated via calorimetry.

Figure 1: (left) MICE beamline at ISIS, with 3 quadrupole triplets and two bends; (right) 3D rendering of MICE.

Although conceptually simple, both ionization cooling and its experimental verification pose challenges:

  • Operation in strong (1–3 T) magnetic fields of high-gradient (16 MV/m), low-frequency (201 MHz) RF cavities. As shown by the Fermilab MuCool program, this exacerbates dark currents and cavity breakdown MuCool ().

  • Safe designs employing substantial amounts of LH near potential ignition sources (RF cavities).

  • The small effect (10%) of an affordable cooling device, which leads to the goal of emittance precision, requiring single-particle measurements rather than standard beam instrumentation.

Iii Current Status

The beamline (built by RAL; see Fig. 1) is now operational. Pions, from a small, movable Ti target (Sheffield Univ.) grazing the ISIS beam during its 2 ms flat-top, are captured by a quadrupole triplet and momentum-selected by a dipole. Muons from decays within a 5-m-long, 12-cm-bore, 5 T solenoid (donated by PSI, Switzerland; now in commissioning) are momentum-selected in a second dipole, at a momentum about half that of the first (giving high muon purity). Three two-layer scintillator-hodoscope TOF stations (Italy, assisted by Geneva and Sofia) each provide 50 ps resolution. The two (Belgium-US) aerogel Cherenkov counters and TOF0 (Fig. 2 left) are placed between quad triplets 2 and 3. Together, the TOF and Cherenkov counters distinguish from up to 300 MeV/.

The 2-m-long spectrometer solenoids (US; Fig. 2 right) will provide 4 T over a 1-m-long, 20-cm-radius tracking volume. Two “end” coils ensure 1% field nonuniformity; two “matching” coils at one end match optics in and out of the cooling cell. The magnets are on order for late-2008 delivery, to be followed by measurement and installation at RAL. Magnet sensors (NIKHEF) will monitor the field. Scintillating-fiber tracker 1 (Japan-UK-US) is complete and undergoing cosmic-ray testing; tracker 2 is in final assembly.

Downstream particle ID comprises TOF2 and a calorimeter (Italy-Geneva-Sofia) to distinguish muons from decay electrons. A first, Pb–scintillating-fiber sandwich layer (similar to the KLOE calorimeter) precedes a 1 m, fully sensitive, segmented scintillator block. The sandwich layer degrades electrons; the scintillator block precisely measures muon range. Prototypes have been tested at Frascati and assembly of final detectors is in progress.

Figure 2: (left) MICE upstream (Cherenkov and TOF) particle-ID detectors and (right) schematic of spectrometer solenoid.

The absorber–focus-coil (AFC) modules (see Fig. 3 left) will each house an absorber, to reduce the muon momentum in all dimensions (and thereby cool the beam), and a pair of focusing coils, to reduce the beta function and hence the equilibrium emittance. While hydrogen is best, for emittance far from equilibrium, a more practical (though somewhat less efficient) absorption medium may be He or (solid) LiH or Be. MICE is therefore designed to test liquid and solid absorbers over a range of beta-function values. Critical hydrogen-system issues are (1) use of the thinnest possible metal containment windows, (2) safety, and (3) hydrogen storage. A prototype metal-hydride storage system is in development at RAL. Safety reviews have been passed successfully, and the AFC modules are on order.

Since the beam to be cooled is large, the RF frequency must be low; due to the focusing magnetic field, NC cavities are used. A large “coupling” coil surrounds the cavities and, to minimize power requirements, Be windows close them. Two RF–Coupling Coil (CC) modules connect three AFC modules (Fig. 3 left) to form the cooling cell. A CERN-refurbished 4 MW RF-power source plus two RF sources donated by LBNL (in refurbishment at Daresbury) give 8 MW in total, allowing 23 MeV of acceleration in MICE Step VI. Coupling Coil construction is commencing at the Institute of Cryogenics and Superconductivity Technology of the Harbin Institute of Technology (China), in collaboration with LBNL. Crucial high-magnetic-field cavity tests await delivery of the first CC.

Figure 3: (left) Schematic of AFC module connected to RFCC module, with cavities closed by curved Be windows, and photo of prototype 201 MHz cavity; (right) planned stages of MICE.

MICE will run at 1 Hz and record up to 600 muons in each 1 ms beam burst. RF amplitude and phase, absorber mass, and other parameters must be precisely known for comparison with predictions and simulations. State-of-the-art instrumentation will monitor and record the relevant parameters (Daresbury-Geneva).

Iv Schedule

The staging of MICE (Fig. 3 right) allows careful calibration at each step and also reflects funding realities. Beam characterization and detector and data-acquisition run-in (Step I) have begun. Once the first spectrometer solenoid is available, a measurement of particle momenta (and hence emittance) will become possible (Step II). In Step III, up- and downstream emittance measurements will be precisely compared, allowing a precise determination of biases and testing of the required correction procedures. Step V will test “repeatable” cooling, in which the momentum lost in the absorbers is restored in the RF cavities. Step VI will test the full cooling cell.

Acknowledgements.
The authors thank their collaborators of the MICE Collaboration. Work supported by Department of Energy under contract DE-AC02-76CH03000 and National Science Foundation grant PHY-031737.

References

  • (1) A. N. Skrinsky and V. V. Parkhomchuk, Sov. J. Nucl. Phys. 12 (1981) 3.
  • (2) See e.g. M. Lindner, Springer Tracts Mod. Phys. 190 (2003) 209, arXiv:hep-ph/0209083 and references therein.
  • (3) C. Ankenbrandt et al., Phys. Rev. ST Accel. Beams 2, 081001 (1999).
  • (4) T. L. Hart and D. M. Kaplan, “Emittance Measurement in MICE,” this conference.
  • (5) See e.g. J. Norem et al., Phys. Rev. ST Accel. Beams 6, 089901 (2003).
Comments 0
Request Comment
You are adding the first comment!
How to quickly get a good reply:
  • Give credit where it’s due by listing out the positive aspects of a paper before getting into which changes should be made.
  • Be specific in your critique, and provide supporting evidence with appropriate references to substantiate general statements.
  • Your comment should inspire ideas to flow and help the author improves the paper.

The better we are at sharing our knowledge with each other, the faster we move forward.
""
The feedback must be of minimum 40 characters and the title a minimum of 5 characters
   
Add comment
Cancel
Loading ...
240242
This is a comment super asjknd jkasnjk adsnkj
Upvote
Downvote
""
The feedback must be of minumum 40 characters
The feedback must be of minumum 40 characters
Submit
Cancel

You are asking your first question!
How to quickly get a good answer:
  • Keep your question short and to the point
  • Check for grammar or spelling errors.
  • Phrase it like a question
Test
Test description